Hybrid plant · one dayAnd if they work together?

And if they work together? A hybrid power plant on a real day

    1 / 4 · Solar only

    Shut down at noon, nothing to sell in the evening

    A real day: Thursday, 23 April 2026. The solar plant is rated at 70 MW, its connection point at 50 MW: no more than that can go into the grid at once. The proportions are those of Hungary's largest operating hybrid plant.

    It produces when all the other solar plants do. That day the price was negative between 11:30 and 16:15: feeding in would have cost money, so the plant shut down. In the evening the price jumped to €500/MWh, but by then the sun had set.

    This really happened: that day Hungary's solar plants produced 18% less between 13:00 and 14:00 than between 10:00 and 11:00, although the sunlight was 19% stronger.

    Over the whole day it sold 230 MWh at an average of €49/MWh; the day's average price was €93/MWh.

    2 / 4 · + battery

    Charges at noon, sells in the evening

    The same connection point gets a battery of 40 MW and 80 MWh: since 2025 the law says that several plants and a storage unit may share one connection point. That's a hybrid power plant. The price was known the day before, so in the cheapest hours the panels charge the battery instead of shutting down, and from 19:30 the battery sells through the same connection point, which carries no power by then anyway.

    From the same sunshine, revenue rises from €11,372 to €34,970. The battery was full at 15:15: whatever came after that, nobody wanted on this day either.

    3 / 4 · + wind

    The connection point is busy at night too

    Five wind turbines (30 MW) join the same connection point. On this day the wind was stronger at night and in the evening and weaker at noon, and across the seasons it complements solar even more: it produces roughly twice as much in winter as in summer.

    Power flows through the connection point for 19 hours instead of 9, and by the end of the day 542 MWh has passed through it. Wind and solar sharing one connection point don't exist in Hungary yet; the hybrid in Hódmezővásárhely would be extended with wind turbines.

    4 / 4 · Separate or together

    More power through one connection point than through three

    Separately, the three plants would need three connection points, 120 MW in total, and since 2022 new solar and wind plants have hardly been given any. As a hybrid, one 50 MW connection point is enough, because they rarely peak at the same time, and when they do, the battery stores the surplus. On this day the hybrid fed 15% more electricity into the grid than the three separate plants together (542 MWh against 472 MWh) and earned 92% of their revenue with 42% of their connection capacity.

    Not a miracle. Batteries are expensive, charging and discharging cost 15% of the energy, and on this day some sunshine still had to be shut down. Older plants on a fixed feed-in tariff (KÁT) keep producing even at negative prices: for them, shutting down doesn't pay. A hybrid makes sense where grid connection is the bottleneck.

    Live: holaszel.hu → holanap.hu → holatarolo.hu →

    How did we calculate this?

    The day is 23 April 2026. The price is the quarter-hourly Hungarian day-ahead price from energy-charts.info (Bundesnetzagentur | SMARD.de, CC BY 4.0). Wind is Hungary's wind generation from energy-charts.info as a share of the 325.1 MW installed, scaled to 30 MW. Solar is a clear-sky curve from the sun's position at Hódmezővásárhely, because the national curve was itself cut back at noon that day. The “this really happened” line uses Open-Meteo archive irradiance (three points on the Great Plain and in Budapest) and national solar output from energy-charts.info.

    The model plant: a 50 MW connection point, 70 MW of solar, a 40 MW / 80 MWh battery with 85% round-trip efficiency (NREL ATB 2024) and 30 MW of wind. It sells nothing at negative prices; the battery charges from its own plant in the day's cheapest quarter hours and sells in the most expensive ones. In the comparison with separate plants the battery stands alone and charges from the grid.

    The facts: the connection limit — MAVIR, May 2022; 273/2007. Korm. r. 9/D. §. Shared connections — VET 39/G. §, since 1 January 2025. Hódmezővásárhely — Portfolio and HVG, 25 September 2026. Wind by season — MEKH, 2024.

    This is a chosen day on which the effect is easy to see: between March and June 2026 the price went negative on 43 of 122 days.